User Log On
GalleryGallery

First Baptist Church of Weston First Baptist Church of Weston

Photo Gallery: Construction Pics (Old) Photo Gallery: Construction Pics (Old)

Construction Pics (Old)
New Heat Ducts in Sanctuary--Shinnston Plumbing
Replaces Steam Heat System.
Viewed 3844 times
Ken & Lynne Head to a CE Meeting
Viewed 3751 times
Brick Repointing--Keystone Waterproofing
Work Begins on the other side of the Church.
Viewed 3692 times
Elevator Entrance 1st Floor--Reliable Builders
The Pit.
Viewed 3786 times
Brick Repointing--Keystone Waterproofing
Side View of Church...Finished with the exception of painting the gutters and windows which will be done after Keystone is finished.
Viewed 3634 times
Elevator Entrance 2nd Floor--Reliable Builders
Classroom Beside Sunday School Office...This will also be the location of the new restrooms
Viewed 3689 times
Brick Repointing--Keystone Waterproofing
Side View of Church...Finished with the exception of painting the gutters and windows which will be done after Keystone is finished.
Viewed 3661 times
Elevator Hallway--Reliable Builders
Future Hallway to Elevator System
Viewed 3668 times
Old Steam Piping Is Removed
In Preparation for Dining Hall Renovations
Viewed 3618 times
Old Steam Piping Is Removed
In Preparation for Dining Hall Renovations
Viewed 3691 times
Black WILL BE GONE!
Viewed 3690 times
Repointing of Brick
Viewed 3691 times
Keystone WaterProofing
Exterior Renovations
Viewed 3619 times
Keystone WaterProofing
Exterior Renovations
Viewed 3560 times
< Previous